Many network outages and equipment failures in small and medium organizations start not with the servers themselves but with unstable power, excessive heat or poor earthing. Check these four areas before buying expensive equipment.

Temperature and airflow

Common industry guidance (ASHRAE) recommends an equipment inlet air temperature between 18 and 27 °C. Cooling more than necessary only raises the electricity bill.

Sizing a UPS

Add up the power consumption of all equipment in watts and add about 20 to 30 percent for growth and safety margin. Note the difference between volt-amperes (VA) and watts (W): a UPS's watt rating is usually lower than its VA figure. Set the backup time (runtime on battery) based on the time needed to shut servers down safely or for a generator to start.

For sensitive equipment, an online (double-conversion) UPS provides more stable output power. Batteries have a limited life and must be tested and replaced on schedule.

Earthing

A proper earthing system protects equipment and people from electric shock, noise and surges. The permitted earth resistance is set by the project's technical specifications and national building regulations; telecom installations and data centers usually target very low values. Measure and document the earth resistance after installation and re-measure it periodically.

Monitoring and maintenance

A small but well-designed server room is more reliable than a large, disorganized one.

Hand this project to HOPA

Data center & power: A stable platform for critical services. Site surveys and cost estimates follow the official trade tariff.

Submit a project requestData center & power services

More guides

Choosing CCTV cameras: analog or IP?Analog vs IP cameras, resolution, lenses, night vision, PoE and weatherproofing: what to decide before you buy.How to calculate CCTV storage (with examples)How many terabytes do your cameras need? A simple formula based on bitrate, camera count and retention days, with worked examples.Network cabling: Cat6 or fiber optic?The 100 m copper limit, Cat6 vs Cat6A, fiber types, and which to use where in a building or campus.